MICROSOFT PROJECT AS AN EFFECTIVE TOOL FOR MANAGING PAVEMENT CONSTRUCTION PLANNING AND SCHEDULING/ (Kayıt no. 141013)

MARC ayrıntıları
000 -BAŞLIK
Sabit Uzunluktaki Kontrol Alanı 04289nam a22003257a 4500
003 - KONTROL NUMARASI KİMLİĞİ
Kontrol Alanı KOHA_MİRAKIL
005 - EN SON İŞLEM TARİHİ ve ZAMANI
Kontrol Alanı 20210728100711.0
008 - SABİT UZUNLUKTAKİ VERİ ÖGELERİ - GENEL BİLGİ
Sabit Alan 201006b cy ||||| |||| 00| 0 eng d
040 ## - KATALOGLAMA KAYNAĞI
Özgün Kataloglama Kurumu CY-NiCIU
Kataloglama Dili eng
Çeviri Kurumu CY-NiCIU
Açıklama Kuralları rda
041 ## - DİL KODU
Özgün materyalin dil kodu eng
090 ## - Yerel Tasnif No
tasnif no YL 1783
Cutter no U46 2020
100 1# - KİŞİ ADI
Yazar Adı (Kişi adı) UGOCHUKWU, AKUBUDE
245 10 - ESER ADI BİLDİRİMİ
Başlık MICROSOFT PROJECT AS AN EFFECTIVE TOOL FOR MANAGING PAVEMENT CONSTRUCTION PLANNING AND SCHEDULING/
Sorumluluk Bildirimi AKUBUDE UGOCHUKWU; Supervisor: Göktuğ Tenekeci
300 ## - FİZİKSEL TANIMLAMA
Sayfa, Cilt vb. sheets VII, 63;
Diğer fiziki detaylar tables, figures,
Boyutları 30.5 cm
Birlikteki Materyal CD.
336 ## - CONTENT TYPE
Source rdacontent
Content type term text
Content type code txt
337 ## - MEDIA TYPE
Source rdamedia
Media type term unmediated
Media type code n
338 ## - CARRIER TYPE
Source rdacarrier
Carrier type term volume
Carrier type code nc
500 ## - GENEL NOT
Genel Not Includes CD
502 ## - TEZ NOTU
Tez Notu Thesis (M.Sc.) - CYPRUS INTERNATIONAL UNIVERSITY INSTITUTE OF GRADUATE STUDIES AND RESEARCH CIVIL ENGINEERING DEPARTMENT
504 ## - BİBLİYOGRAFİ NOTU
Bibliyografi Notu Includes REFERENCES: sheets 57-63
520 ## - ÖZET NOTU
Özet notu ABSTRACT<br/>The metric for measurement of the growth in developing countries is correlated to the improvement of infrastructure in the country; for which road transport represents a significant economic yardstick. The construction of roads presents multi-dimensional benefits to a country, interlinking regions or cities, fostering market sales, importation and exportation activities, job creations and many more. The efficiency in carrying out road construction is a vital subject matter in the discourse of economic development; hence the study of project management. Any road construction project requires adequate planning in terms of quality, time management and cost. In addition, resource optimization is a key feature in sustainability management, hence, project management is very important. Lagos, Nigeria is a fast-growing economy in Africa, with vast human and material resources; and road construction activities is on a high. However, there is not enough focus on efficiency of road construction in the region; which can be stated to be one of the major reasons why the durability of road projects in Lagos state is on a low and risks delivery to programmed duration and budget. In this thesis, the problem being tackled is the issue of unnecessary lengthened construction project prevalent in Lagos state. Also, the issue of planning of activities and allocation of resources has been a consistent issue in the construction industry in Nigeria. The project studied in this thesis is specifically considered as the company in charge of the project is not using any software in the process flow of the construction activities and this pose a very serious problem.<br/>In order to present a simple and efficient methodology for planning and scheduling for road construction, that can be effectively useful for managing sufficient flow of resources, this thesis analyses the use of Microsoft Project for planning, scheduling and resource optimization for a pavement road construction in Lagos state. The project used as a case study is an ongoing Estate road construction in the Island region of Lagos state. The study found that the efficiency that can be created is estimated in the region of The total collective resource hours committed by the organization to the project during the 12 month duration of the project to prevent time overrun is 26640 hours and the maximum number of work hours assigned was 10892 hours which accounted for 40.9% of the total collective resource hours. The highest number of resources hours committed to the project was in September which accounted for 19.8% of the total hours of resources used in the project duration whereas, the month of December accounted for the lowest number of resources hours due to a huge decline the number of activities taking place. The report of Cash flow showed that the first quarter accounted for 29.05% of the total project cost, while the month of September showed the highest expenditure in the 12 month period.<br/>Keywords: Infrastructure, project management, Microsoft Project, Pavement, Road Construction.
650 00 - KONU BAŞLIĞI EK GİRİŞ - KONU TERİMİ
Konusal terim veya coğrafi ad Infrastructure
650 00 - KONU BAŞLIĞI EK GİRİŞ - KONU TERİMİ
Konusal terim veya coğrafi ad Project management
650 00 - KONU BAŞLIĞI EK GİRİŞ - KONU TERİMİ
Konusal terim veya coğrafi ad Microsoft Project
650 00 - KONU BAŞLIĞI EK GİRİŞ - KONU TERİMİ
Konusal terim veya coğrafi ad Pavement
650 00 - KONU BAŞLIĞI EK GİRİŞ - KONU TERİMİ
Konusal terim veya coğrafi ad Road Construction
700 1# - EK GİRİŞ - KİŞİ ADI
Yazar Adı (Kişi adı) Supervisor: Tenekeci, Göktuğ
9 (RLIN) 1656
942 ## - EK GİRİŞ ÖGELERİ (KOHA)
Sınıflama Kaynağı Dewey Onlu Sınıflama Sistemi
Materyal Türü Thesis
Mevcut
Geri Çekilme Durumu Kayıp Durumu Sınıflandırma Kaynağı Kredi için değil Koleksiyon Kodu Kalıcı Konum Mevcut Konum Raf Yeri Kayıt Tarih Source of acquisition Toplam Ödünçverme Yer Numarası Demirbaş Numarası Son Görülme Tarihi Son Kontrol Tarihi Fatura Tarihi Materyal Türü Genel / Bağış Notu
    Dewey Onlu Sınıflama Sistemi   Tez Koleksiyonu CIU LIBRARY CIU LIBRARY Tez Koleksiyonu 06.10.2020 Bağış 1 YL 1783 U46 2020 T1989 06.06.2022 06.06.2022 06.10.2020 Thesis Civil Engineering Department
Araştırmaya Başlarken  
  Sıkça Sorulan Sorular