RISK MANAGEMENT IN DELIVERY OF TRANSPORT PROJECTS / (Kayıt no. 290044)

MARC ayrıntıları
000 -BAŞLIK
Sabit Uzunluktaki Kontrol Alanı 03781nam a22003137a 4500
003 - KONTROL NUMARASI KİMLİĞİ
Kontrol Alanı KOHA
005 - EN SON İŞLEM TARİHİ ve ZAMANI
Kontrol Alanı 20230418090052.0
008 - SABİT UZUNLUKTAKİ VERİ ÖGELERİ - GENEL BİLGİ
Sabit Alan 230323d2023 c d|||| m||| 00| 0 eng d
040 ## - KATALOGLAMA KAYNAĞI
Özgün Kataloglama Kurumu CY-NiCIU
Kataloglama Dili eng
Çeviri Kurumu CY-NiCIU
Açıklama Kuralları rda
041 ## - DİL KODU
Metin ya da ses kaydının dil kodu eng
090 ## - Yerel Tasnif No
tasnif no YL 2836
Cutter no A34 2023
100 1# - KİŞİ ADI
Yazar Adı (Kişi adı) Abdulrahman, Abu Sayf Jamal Aldeen Mohammed
245 10 - ESER ADI BİLDİRİMİ
Başlık RISK MANAGEMENT IN DELIVERY OF TRANSPORT PROJECTS /
Sorumluluk Bildirimi ABU SAYF JAMAL ALDEEN MOHAMMED ABDULRAHMAN; SUPERVISOR: ASSOC. PROF. DR. AYŞE PEKRİOĞLU BALKIS; CO-SUPEVISOR: ASST. PROF. DR. GÖKTUĞ TENEKECI
246 23 - DEĞİŞİK BAŞLIK FORMU
Başlık uygun / kısa başlık AN INVESTIGATION INTO PROJECTS DELIVERY RISKS FOR LIBYA
264 ## - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Date of production, publication, distribution, manufacture, or copyright notice 2023
300 ## - FİZİKSEL TANIMLAMA
Sayfa, Cilt vb. 95 sheets;
Boyutları 31 cm.
Birlikteki Materyal Includes CD
336 ## - CONTENT TYPE
Source rdacontent
Content type term text
Content type code txt
337 ## - MEDIA TYPE
Source rdamedia
Media type term unmediated
Media type code n
338 ## - CARRIER TYPE
Source rdacarrier
Carrier type term volume
Carrier type code nc
502 ## - TEZ NOTU
Tez Notu Thesis (MSc) - Cyprus International University. Institute of Graduate Studies and Research Civil Engineering Department
504 ## - BİBLİYOGRAFİ NOTU
Bibliyografi Notu Includes bibliography (sheets 78-82)
520 ## - ÖZET NOTU
Özet notu ABSTRACT<br/>The effects of risk management on the completion rate of delivering transport <br/>construction projects in Libya have been investigated and presented following an <br/>extensive data collection and analysis.<br/>The purpose of the research is to get a deeper comprehension of different potential risk <br/>variables that have been categorized into seven different categories. In addition to this, <br/>the study intends to investigate the efficacy of various preventatives through seven <br/>categories and mitigating with six measures. In addition, it is necessary to investigate <br/>the implementation of risk assessment strategies in transport construction projects <br/>throughout the State of Libya.<br/>In order to accomplish the goals of the research, a closed-ended questionnaire was <br/>employed as the data collection method. The experts involved in the transportation <br/>infrastructure projects, such as consultants, owners, contractors, site/office engineers,<br/>and sub-contractors, each received one of the eighty-five questionnaires that were <br/>handed out. Microsoft Excel package was utilized in the process of data analysis. <br/>According to the comments of the participants, the five most significant risk factors <br/>are as follows: political instability, corruption and bribery, inflation and unexpected <br/>rises in the cost of materials and equipment, an absence of financial resources, and late <br/>fees to the contractor. These key risk concerns are mostly connected to groups in the <br/>financial, political, and governmental sectors, and the legal sector, respectively.<br/>According to the findings of the survey, the majority of owners and contractors suffer <br/>from a lack of information regarding the methods in which risks can be mitigated and <br/>prevented. Estimations of both time and cost almost always rely on the subjective <br/>judgment gained through experience.<br/>According to the findings and recommendations of the study, additional action is <br/>required to eliminate the issues that are caused by badly managed transportation <br/>infrastructure projects. Therefore, owners and contractors should take responsibility <br/>for managing their various variables and begin working to resolve possible issues as <br/>early in the process as possible, starting with the feasibility stage. This is considered <br/>to allow for a smoother and more successful completion of the project.<br/>Keywords: Delivery Risks, Key Risk, Libya, Risk Management, Transportation <br/>Infrastructure, Transport Projects.
650 #0 - KONU BAŞLIĞI EK GİRİŞ - KONU TERİMİ
Konusal terim veya coğrafi ad Risk management
Alt başlık biçimi Dissertations, Academic
650 #0 - KONU BAŞLIĞI EK GİRİŞ - KONU TERİMİ
Konusal terim veya coğrafi ad Transportation
Alt başlık biçimi Dissertations, Academic
700 1# - EK GİRİŞ - KİŞİ ADI
Yazar Adı (Kişi adı) Balkıs, Ayşe Pekrioğlu
İlişkili Terim supervisor
700 1# - EK GİRİŞ - KİŞİ ADI
Yazar Adı (Kişi adı) Tenekeci, Göktuğ
İlişkili Terim supervisor
942 ## - EK GİRİŞ ÖGELERİ (KOHA)
Sınıflama Kaynağı Dewey Onlu Sınıflama Sistemi
Materyal Türü Thesis
Mevcut
Geri Çekilme Durumu Kayıp Durumu Sınıflandırma Kaynağı Kredi için değil Koleksiyon Kodu Kalıcı Konum Mevcut Konum Raf Yeri Kayıt Tarih Source of acquisition Yer Numarası Demirbaş Numarası Son Görülme Tarihi Fatura Tarihi Materyal Türü Genel / Bağış Notu
    Dewey Onlu Sınıflama Sistemi   Tez Koleksiyonu CIU LIBRARY CIU LIBRARY Tez Koleksiyonu 23.03.2023 Bağış YL 2836 A34 2023 T3175 23.03.2023 23.03.2023 Thesis Civil Engineering Department
    Dewey Onlu Sınıflama Sistemi     CIU LIBRARY CIU LIBRARY Görsel İşitsel 23.03.2023 Bağış YL 2836 A34 2023 CDT3175 23.03.2023 23.03.2023 Suppl. CD Civil Engineering Department
Araştırmaya Başlarken  
  Sıkça Sorulan Sorular