INFLUENCE OF TIME AND COST OVERRUN ON CONSTRUCTION PROJECTS IN AFGHANISTAN / (Kayıt no. 293024)

MARC ayrıntıları
000 -BAŞLIK
Sabit Uzunluktaki Kontrol Alanı 02651nam a22002657a 4500
003 - KONTROL NUMARASI KİMLİĞİ
Kontrol Alanı KOHA
005 - EN SON İŞLEM TARİHİ ve ZAMANI
Kontrol Alanı 20250108110132.0
008 - SABİT UZUNLUKTAKİ VERİ ÖGELERİ - GENEL BİLGİ
Sabit Alan 240927d2024 cy ed||| |||| 00| 0 eng d
040 ## - KATALOGLAMA KAYNAĞI
Özgün Kataloglama Kurumu CY-NiCIU
Kataloglama Dili eng
Çeviri Kurumu CY-NiCIU
Açıklama Kuralları rda
041 ## - DİL KODU
Metin ya da ses kaydının dil kodu eng
090 ## - Yerel Tasnif No
tasnif no YL 3511
Cutter no R67 2024
100 1# - KİŞİ ADI
Yazar Adı (Kişi adı) Rostami, Marjan
245 10 - ESER ADI BİLDİRİMİ
Başlık INFLUENCE OF TIME AND COST OVERRUN ON CONSTRUCTION PROJECTS IN AFGHANISTAN /
Sorumluluk Bildirimi ROSTAMI MARJAN ; SUPERVISOR, PROF. DR. TAHİR ÇELİK
264 ## - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Date of production, publication, distribution, manufacture, or copyright notice 2024
300 ## - FİZİKSEL TANIMLAMA
Sayfa, Cilt vb. 117 sheets ;
Boyutları 30 cm
Birlikteki Materyal +1 CD ROM
336 ## - CONTENT TYPE
Source rdacontent
Content type term text
Content type code txt
337 ## - MEDIA TYPE
Source rdamedia
Media type term unmediated
Media type code n
338 ## - CARRIER TYPE
Source rdacarrier
Carrier type term volume
Carrier type code nc
502 ## - TEZ NOTU
Tez Notu Thesis (MSc) - Cyprus International University. Institute of Graduate Studies and Research Civil Engineering
520 ## - ÖZET NOTU
Özet notu Time and cost overruns in construction projects are major concerns in Afghanistan as a developing country. Understanding these overruns enables organizations to improve project outcomes, enhance financial performance, and maintain positive relationships with stakeholders, ultimately contributing to long-term success and sustainability.<br/>This research highlights the significant challenges posed by time and cost overruns in Afghan construction projects. It identifies twelve categories of factors contributing to time overruns and twenty significant factors leading to cost overruns, based on an analysis of twenty-six selected projects. The categories for time overruns include poor project planning, inadequate resource allocation, and bureaucratic delays, while factors for cost overruns encompass inaccurate cost estimation, price escalation of materials, and financial mismanagement.<br/>Addressing these challenges requires a nuanced understanding of the complex interplay of factors involved. This enables organizations to enhance project management strategies, improve overall project outcomes, and mitigate risks associated with overruns. Effective strategies may involve better project planning, stringent cost control measures, and improved stakeholder communication.<br/>In conclusion, tackling time and cost overruns is crucial for the success of construction projects in Afghanistan. By identifying and addressing the contributing factors, organizations can achieve better project efficiency, reduce financial losses, and ensure timely project completion. This research provides valuable insights for improving project management practices and achieving sustainable development in the Afghan construction industry.
650 #0 - KONU BAŞLIĞI EK GİRİŞ - KONU TERİMİ
Konusal terim veya coğrafi ad Civil Engineering
Alt başlık biçimi Dissertations, Academic
700 1# - EK GİRİŞ - KİŞİ ADI
Yazar Adı (Kişi adı) Çelik, Tahir
İlişkili Terim supervısor
942 ## - EK GİRİŞ ÖGELERİ (KOHA)
Sınıflama Kaynağı Dewey Onlu Sınıflama Sistemi
Materyal Türü Thesis
Mevcut
Geri Çekilme Durumu Kayıp Durumu Sınıflandırma Kaynağı Kredi için değil Koleksiyon Kodu Kalıcı Konum Mevcut Konum Raf Yeri Kayıt Tarih Source of acquisition Toplam Ödünçverme Yer Numarası Demirbaş Numarası Son Görülme Tarihi Kopya Bilgisi Fatura Tarihi Materyal Türü Genel / Bağış Notu
    Dewey Onlu Sınıflama Sistemi   Tez Koleksiyonu CIU LIBRARY CIU LIBRARY Depo 25.10.2024 Bağış   YL 3511 R67 2024 T3958 25.10.2024 C.1 25.10.2024 Thesis Civil Engineering
    Dewey Onlu Sınıflama Sistemi   Tez Koleksiyonu CIU LIBRARY CIU LIBRARY Görsel İşitsel 25.10.2024 Bağış   YL 3511 R67 2024 CDT3958 25.10.2024 C.1 25.10.2024 Suppl. CD Civil Engineering
Araştırmaya Başlarken  
  Sıkça Sorulan Sorular