Importance of life cycle cost analysis in construction projects, a case study of Nnamdi Azikiwe international airport in Nigeria (Kayıt no. 742)
[ düz görünüm ]
000 -BAŞLIK | |
---|---|
Sabit Uzunluktaki Kontrol Alanı | 02872na a2200325 4500 |
001 - KONTROL NUMARASI | |
Control Dosyası | 241321 |
003 - KONTROL NUMARASI KİMLİĞİ | |
Kontrol Alanı | koha_MIRAKIL |
005 - EN SON İŞLEM TARİHİ ve ZAMANI | |
Kontrol Alanı | 20221226090207.0 |
008 - SABİT UZUNLUKTAKİ VERİ ÖGELERİ - GENEL BİLGİ | |
Sabit Alan | 190207b tu 000 0 |
040 ## - KATALOGLAMA KAYNAĞI | |
Özgün Kataloglama Kurumu | CY-NiCIU |
Kataloglama Dili | tur |
Çeviri Kurumu | CY-NiCIU |
Açıklama Kuralları | rda |
041 0# - DİL KODU | |
Metin ya da ses kaydının dil kodu | eng |
090 ## - Yerel Tasnif No | |
tasnif no | YL 656 |
Cutter no | A28 2015 |
100 1# - KİŞİ ADI | |
Yazar Adı (Kişi adı) | Abubakar, Amina Baby |
245 0# - ESER ADI BİLDİRİMİ | |
Başlık | Importance of life cycle cost analysis in construction projects, a case study of Nnamdi Azikiwe international airport in Nigeria |
Sorumluluk Bildirimi | Amina Baby Abubakar; Supervisor: Tahir Çelik |
260 ## - YAYIN, DAĞITIM, VB. | |
Yayın Yeri | Nicosia |
Yayınevi | Cyprus International University |
Yayın Tarihi | 2015 |
300 ## - FİZİKSEL TANIMLAMA | |
Sayfa, Cilt vb. | XIII, 91 p. |
Diğer fiziki detaylar | color table, figure |
Boyutları | 30.5 cm |
Birlikteki Materyal | CD |
336 ## - CONTENT TYPE | |
Source | rdacontent |
Content type term | text |
Content type code | txt |
337 ## - MEDIA TYPE | |
Source | rdamedia |
Media type term | unmediated |
Media type code | n |
338 ## - CARRIER TYPE | |
Source | rdacarrier |
Carrier type term | volume |
Carrier type code | nc |
500 ## - GENEL NOT | |
Materials specified | Includes CD |
504 ## - BİBLİYOGRAFİ NOTU | |
Bibliyografi Notu | Includes references (83-91 p.) |
520 ## - ÖZET NOTU | |
Özet notu | 'ABSTRACT Over the years, failure in the construction industry has gradually increased of which cost is a major factor. This problem is usually cost related born out of improper projections or negligence. In a quest to prevent this scenario, we embarked on this research work. This study accesses the construction stakeholders perception on the causes of non-functional facilities or building projects as a result of associated cost that were not been considered at the conceptual stage. This research work is centered arround a gradually failing facility located in the fedral capital territory of NIGERIA, Abuja. ( Nnamdi Azikiwe international Airport) . It is important to note that the scope of this work is basically the building components of the above named building facility. In order to profer solution to this predicarment, Life cycle cost Analysis technique was implored (LCCA) and an aspect of value management which is the job plan to facilitate proper decision making. Due to the fact that LCCA is relatively new in this part of the world where the airport is located, it is harldy implored by project managers. It is also fairly popular as a result of ignorance and mainly the calculations invoved. A tempelate( excel spread sheet) was developed to compute LCCA automatically, provided necssary data is inputted. This spread sheet was evaluated and tested and it is did tremendoously well. This study seek to appraise the use of LCCA technique in determining the most suitable alternative for the above mentioned buildingf facility. This research work is aimed aimed at proferring solution to Nnamdi Azikiwe international airport, Nigeria which is presently failing to meet up to its original requirment. ' |
650 00 - KONU BAŞLIĞI EK GİRİŞ - KONU TERİMİ | |
Konusal terim veya coğrafi ad | Life cycle cost analysis |
650 00 - KONU BAŞLIĞI EK GİRİŞ - KONU TERİMİ | |
Konusal terim veya coğrafi ad | Yaşam döngüsü maliyet analizi |
650 00 - KONU BAŞLIĞI EK GİRİŞ - KONU TERİMİ | |
Konusal terim veya coğrafi ad | Construction industry |
650 00 - KONU BAŞLIĞI EK GİRİŞ - KONU TERİMİ | |
Konusal terim veya coğrafi ad | İnşaat sektörü |
700 0# - EK GİRİŞ - KİŞİ ADI | |
Yazar Adı (Kişi adı) | Supervisor: Çelik, Tahir |
9 (RLIN) | 1656 |
942 ## - EK GİRİŞ ÖGELERİ (KOHA) | |
Sınıflama Kaynağı | Dewey Onlu Sınıflama Sistemi |
Materyal Türü | Thesis |
Geri Çekilme Durumu | Kayıp Durumu | Sınıflandırma Kaynağı | Kredi için değil | Koleksiyon Kodu | Kalıcı Konum | Mevcut Konum | Raf Yeri | Kayıt Tarih | Source of acquisition | Maliyet, Alış Fiyatı | Yer Numarası | Demirbaş Numarası | Son Görülme Tarihi | Maliyet, Yenileme Fiyatı | Fatura Tarihi | Materyal Türü | Genel / Bağış Notu |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Dewey Onlu Sınıflama Sistemi | Tez Koleksiyonu | CIU LIBRARY | CIU LIBRARY | Tez Koleksiyonu | 25.08.2015 | Bağış | 0.00 | YL 656 A28 2015 | T723 | 25.08.2015 | 0.00 | 25.08.2015 | Thesis | Civil Engineering Department |