MARC ayrıntıları
000 -BAŞLIK |
Sabit Uzunluktaki Kontrol Alanı |
02630nam a22003137a 4500 |
003 - KONTROL NUMARASI KİMLİĞİ |
Kontrol Alanı |
KOHA_MİRAKIL |
005 - EN SON İŞLEM TARİHİ ve ZAMANI |
Kontrol Alanı |
20210727142007.0 |
008 - SABİT UZUNLUKTAKİ VERİ ÖGELERİ - GENEL BİLGİ |
Sabit Alan |
200728b cy ||||| |||| 00| 0 eng d |
040 ## - KATALOGLAMA KAYNAĞI |
Özgün Kataloglama Kurumu |
CY-NiCIU |
Kataloglama Dili |
tur |
Çeviri Kurumu |
CY-NiCIU |
Açıklama Kuralları |
rda |
041 ## - DİL KODU |
Metin ya da ses kaydının dil kodu |
eng |
090 ## - Yerel Tasnif No |
tasnif no |
YL 1738 |
Cutter no |
A28 2020 |
100 1# - KİŞİ ADI |
Yazar Adı (Kişi adı) |
Abughayyada, Hisham |
245 10 - ESER ADI BİLDİRİMİ |
Başlık |
Determination of bill of quantity calculation performance of a BIM Software: |
Alt Eseradı vb. |
A case study on reinforced concrete multi-story building projects |
Sorumluluk Bildirimi |
Hisham Abughayyada; Supervisor: Kemal Dirgen Tözer |
260 ## - YAYIN, DAĞITIM, VB. |
Yayın Yeri |
Nicosia: |
Yayınevi |
Cyprus International University, |
Yayın Tarihi |
2020. |
300 ## - FİZİKSEL TANIMLAMA |
Sayfa, Cilt vb. |
VII, 68 p.; |
Diğer fiziki detaylar |
table, color figure, color chart, |
Boyutları |
30.5 cm |
Birlikteki Materyal |
CD |
336 ## - CONTENT TYPE |
Source |
rdacontent |
Content type term |
text |
Content type code |
txt |
337 ## - MEDIA TYPE |
Source |
rdamedia |
Media type term |
unmediated |
Media type code |
n |
338 ## - CARRIER TYPE |
Source |
rdacarrier |
Carrier type term |
volume |
Carrier type code |
nc |
500 ## - GENEL NOT |
Genel Not |
Includes CD |
502 ## - TEZ NOTU |
Tez Notu |
ABSTRACT<br/>Cost estimation is an important aspect of any construction project. Recent technological advances have brought major changes to the construction industry. In particular, certain technical applications such as building information modeling (BIM) bring many possibilities. Due to the rapid development of BIM, it is well known that the construction industry has an excellent cost estimation tool in some projects. This study investigates the needed time and accuracy of Bill of Quantity (BOQ) calculations using BIM through the comparative study using REVIT the most popular BIM software and traditional calculation methods by using Microsoft Excel. The main purpose of this study was to compare the performance of traditional hand calculation methods and REVIT as a BIM software in speed, accuracy, and efficiency. Two case studies were selected for this study and investigated for main elements such as foundations, staircase, beams, columns, and floors. This study used a time record to record the time for both methods. The results of the study show that the use of BIM for concept assessment can reduce errors and faster give the quantitative takeoffs compared to traditional methods, while maintaining comparable accuracy. In both case studies, the BIM method was obviously faster reliable and more accurate.<br/>Key words: BIM, BOQ, Cost Estimation, Revit, Quantity take-off, Construction Industry. |
504 ## - BİBLİYOGRAFİ NOTU |
Bibliyografi Notu |
Includes bibliography (42-46 p.) |
650 00 - KONU BAŞLIĞI EK GİRİŞ - KONU TERİMİ |
Konusal terim veya coğrafi ad |
Cost estimation -- Revit |
650 00 - KONU BAŞLIĞI EK GİRİŞ - KONU TERİMİ |
Konusal terim veya coğrafi ad |
Maliyet tahmini - Revit |
650 00 - KONU BAŞLIĞI EK GİRİŞ - KONU TERİMİ |
Konusal terim veya coğrafi ad |
Quantity take-off -- Construction industry |
650 00 - KONU BAŞLIĞI EK GİRİŞ - KONU TERİMİ |
Konusal terim veya coğrafi ad |
Miktar kalkış - İnşaat sektörü |
700 1# - EK GİRİŞ - KİŞİ ADI |
Yazar Adı (Kişi adı) |
Supervisor: Tözer, Kemal Dirgen |
9 (RLIN) |
1656 |
942 ## - EK GİRİŞ ÖGELERİ (KOHA) |
Sınıflama Kaynağı |
Dewey Onlu Sınıflama Sistemi |
Materyal Türü |
Thesis |