DELAY FACTORS OF CONSTRUCTION PROJECTS IN OMAN / AMUR ALI MUSSALAM AL AMRI; SUPERVISOR: ASST. PROF. DR. ALI ERHAN OZTEMİR

Yazar: Katkıda bulunan(lar):Dil: İngilizce 2022Tanım: 56 sheets; 31 cm. Inlcudes CDİçerik türü:
  • text
Ortam türü:
  • unmediated
Taşıyıcı türü:
  • volume
Konu(lar): Tez notu: Thesis (MSc) - Cyprus International University. Institute of Graduate Studies and Research Civil Engineering Department Özet: ABSTRACT The construction industry in Oman has seen a significant development in growth to the extent that is now the second biggest economic contributor in Oman. This economic sector has led to developments in tourism, infrastructural amenities and much more in the country. However, just like other sectors of every economy, the construction development industry in Oman has been reported to have a lot of challenges with regards to delay in completion and delivery of projects, some very prominent factors which have been associated with delay in construction projects have been identified to be significant contributors even in the construction industry in Oman. This study was carried out to investigate the extent of the impact of this construction project delay factors such as client related challenges, contractor related challenges, administration and government related challenges on construction project delay in Oman, the study also investigated the relationship and dependency of these highlighted challenges with respect to construction project ownership. The results of this study have carried our empirical data analysis which have been reported as having no significant association and dependency on the ownership of construction projects by the prominent construction project delay factors reviewed. Further findings have been established through the empirical data analysis which have shown some of the delay causing factors in construction projects in Oman are more prevalent and more impactful on construction project completion and delivery to which necessary recommendations have been made to adequately mitigate them. Keywords: Construction delay; Gulf countries; Oman; Project ownership
Materyal türü: Thesis
Mevcut
Materyal türü Geçerli Kütüphane Koleksiyon Yer Numarası Durum Notlar İade tarihi Barkod Materyal Ayırtmaları
Thesis Thesis CIU LIBRARY Tez Koleksiyonu Tez Koleksiyonu YL 2725 A67 2022 (Rafa gözat(Aşağıda açılır)) Kullanılabilir Civil Engineering Department T3054
Suppl. CD Suppl. CD CIU LIBRARY Görsel İşitsel YL 2725 A67 2022 (Rafa gözat(Aşağıda açılır)) Kullanılabilir Civil Engineering Department CDT3054
Toplam ayırtılanlar: 0

Thesis (MSc) - Cyprus International University. Institute of Graduate Studies and Research Civil Engineering Department

Includes bibliography (sheets 50-53)

ABSTRACT
The construction industry in Oman has seen a significant development in growth to
the extent that is now the second biggest economic contributor in Oman. This
economic sector has led to developments in tourism, infrastructural amenities and
much more in the country. However, just like other sectors of every economy, the
construction development industry in Oman has been reported to have a lot of
challenges with regards to delay in completion and delivery of projects, some very
prominent factors which have been associated with delay in construction projects have
been identified to be significant contributors even in the construction industry in
Oman. This study was carried out to investigate the extent of the impact of this
construction project delay factors such as client related challenges, contractor related
challenges, administration and government related challenges on construction project
delay in Oman, the study also investigated the relationship and dependency of these
highlighted challenges with respect to construction project ownership. The results of
this study have carried our empirical data analysis which have been reported as having
no significant association and dependency on the ownership of construction projects
by the prominent construction project delay factors reviewed. Further findings have
been established through the empirical data analysis which have shown some of the
delay causing factors in construction projects in Oman are more prevalent and more
impactful on construction project completion and delivery to which necessary
recommendations have been made to adequately mitigate them.
Keywords: Construction delay; Gulf countries; Oman; Project ownership