IDENTIFYING AND MANAGING MOST COMMON ROSKS IN NIGERIAN CONSTRCUTION PROJECTS / VIVIAN CHINWENDU OKPALAKU-NATH; SUPERVISOR: ASST. PROF. DR. ALI ERHAN ÖZTEMİR

Yazar: Katkıda bulunan(lar):Dil: İngilizce 2022Tanım: 75 sheets; 31 cm. Includes CDİçerik türü:
  • text
Ortam türü:
  • unmediated
Taşıyıcı türü:
  • volume
Diğer başlık:
  • (A CASE STUDY OF LAGOS STATE)
Konu(lar): Tez notu: Thesis (MSc) - Cyprus International University. Institute of Graduate Studies and Research Civil Engineering Department Özet: ABSTRACT In order to carry out a construction project successfully, there is a need to manage the risks involved in terms of duration, quality and time. Risk in construction projects is inevitable but can be controlled to avoid delay or cost overrun. Therefore construction project risk management is simply a method of planning, identifying, assessing and providing the best method for handling or managing projects risks (existing or future risks). Several construction projects globally still encounter difficulties due to mismanagement or bad managerial system in spite of the constant improvement in the aspect of project risk management especially in the African region. In Nigeria, a high rate of project failure is being encountered simply because of the absence of having or using a standard risk management techniques or model. It is very important to have an in depth knowledge and a solid foundation of various construction practice and the environment. This research will help to identify, asses and control the most common risks risk factors in various phases of Nigerian construction projects which will help in allocating responsibilities to the construction parties involved. The research method was the use of google questionnaire survey forms to collect data from field practitioners in various Nigerian construction firms which was based on a broad assessment of the probability of occurrence and the risk impacts on the project goals. The results of the survey were used for analysis using the statistical package for social sciences software (SPSS version 28). Keywords: Construction Projects, Risk, Risk Factors, Risk Management.Özet: ÖZET Bir inşaat projesinin başarılı bir şekilde yürütülebilmesi için süre, kalite ve zaman açısından içerdiği risklerin yönetilmesine ihtiyaç vardır. İnşaat projelerinde risk kaçınılmazdır ancak gecikme veya maliyet aşımını önlemek için kontrol edilebilir. Bu nedenle inşaat proje risk yönetimi, proje risklerini (mevcut veya gelecekteki riskler) ele almak veya yönetmek için en iyi yöntemi planlama, belirleme, değerlendirme ve sağlama yöntemidir. Özellikle Afrika bölgesinde proje risk yönetimi açısından sürekli iyileştirmeye rağmen, küresel olarak birçok inşaat projesi, yanlış yönetim veya kötü yönetim sistemi nedeniyle hala zorluklarla karşılaşmaktadır. Nijerya'da, standart bir risk yönetimi tekniklerine veya modeline sahip olunmaması veya kullanılmaması nedeniyle yüksek oranda proje başarısızlığı ile karşılaşılmaktadır. Çeşitli inşaat uygulamaları ve çevre hakkında derinlemesine bilgi ve sağlam bir temele sahip olmak çok önemlidir. Bu araştırma, Nijerya inşaat projelerinin çeşitli aşamalarındaki en yaygın risk faktörlerini belirlemeye, değerlendirmeye ve kontrol etmeye yardımcı olacak ve bu da ilgili inşaat taraflarına sorumlulukların tahsis edilmesine yardımcı olacaktır. Araştırma yöntemi, çeşitli Nijeryalı inşaat firmalarındaki saha uygulayıcılarından veri toplamak için google anket anket formlarının kullanılmasıydı ve bu, meydana gelme olasılığının ve proje hedefleri üzerindeki risk etkilerinin geniş bir değerlendirmesine dayanıyordu. Anket sonuçları, sosyal bilimler yazılımı için istatistiksel paket (SPSS sürüm 28) kullanılarak analiz için kullanıldı. Anahtar Kelimeler: Inşaat Projeleri, Risk, Risk Faktörleri, Risk Yönetimi.
Materyal türü: Thesis
Mevcut
Materyal türü Geçerli Kütüphane Koleksiyon Yer Numarası Durum Notlar İade tarihi Barkod Materyal Ayırtmaları
Thesis Thesis CIU LIBRARY Tez Koleksiyonu Tez Koleksiyonu YL 2673 O47 2022 (Rafa gözat(Aşağıda açılır)) Kullanılabilir Civil Engineering Department T3002
Suppl. CD Suppl. CD CIU LIBRARY Görsel İşitsel YL 2673 O47 2022 (Rafa gözat(Aşağıda açılır)) Kullanılabilir Civil Engineering Department CDT3002
Toplam ayırtılanlar: 0

Thesis (MSc) - Cyprus International University. Institute of Graduate Studies and Research Civil Engineering Department

Includes bibliography (sheets 59-68)

ABSTRACT
In order to carry out a construction project successfully, there is a need to manage the
risks involved in terms of duration, quality and time. Risk in construction projects is
inevitable but can be controlled to avoid delay or cost overrun. Therefore construction
project risk management is simply a method of planning, identifying, assessing and
providing the best method for handling or managing projects risks (existing or future
risks). Several construction projects globally still encounter difficulties due to
mismanagement or bad managerial system in spite of the constant improvement in the
aspect of project risk management especially in the African region. In Nigeria, a high
rate of project failure is being encountered simply because of the absence of having or
using a standard risk management techniques or model. It is very important to have an
in depth knowledge and a solid foundation of various construction practice and the
environment. This research will help to identify, asses and control the most common
risks risk factors in various phases of Nigerian construction projects which will help
in allocating responsibilities to the construction parties involved. The research method
was the use of google questionnaire survey forms to collect data from field
practitioners in various Nigerian construction firms which was based on a broad
assessment of the probability of occurrence and the risk impacts on the project goals.
The results of the survey were used for analysis using the statistical package for social
sciences software (SPSS version 28).
Keywords: Construction Projects, Risk, Risk Factors, Risk Management.

ÖZET
Bir inşaat projesinin başarılı bir şekilde yürütülebilmesi için süre, kalite ve zaman
açısından içerdiği risklerin yönetilmesine ihtiyaç vardır. İnşaat projelerinde risk
kaçınılmazdır ancak gecikme veya maliyet aşımını önlemek için kontrol edilebilir. Bu
nedenle inşaat proje risk yönetimi, proje risklerini (mevcut veya gelecekteki riskler)
ele almak veya yönetmek için en iyi yöntemi planlama, belirleme, değerlendirme ve
sağlama yöntemidir. Özellikle Afrika bölgesinde proje risk yönetimi açısından sürekli
iyileştirmeye rağmen, küresel olarak birçok inşaat projesi, yanlış yönetim veya kötü
yönetim sistemi nedeniyle hala zorluklarla karşılaşmaktadır. Nijerya'da, standart bir
risk yönetimi tekniklerine veya modeline sahip olunmaması veya kullanılmaması
nedeniyle yüksek oranda proje başarısızlığı ile karşılaşılmaktadır. Çeşitli inşaat
uygulamaları ve çevre hakkında derinlemesine bilgi ve sağlam bir temele sahip olmak
çok önemlidir. Bu araştırma, Nijerya inşaat projelerinin çeşitli aşamalarındaki en
yaygın risk faktörlerini belirlemeye, değerlendirmeye ve kontrol etmeye yardımcı
olacak ve bu da ilgili inşaat taraflarına sorumlulukların tahsis edilmesine yardımcı
olacaktır. Araştırma yöntemi, çeşitli Nijeryalı inşaat firmalarındaki saha
uygulayıcılarından veri toplamak için google anket anket formlarının kullanılmasıydı
ve bu, meydana gelme olasılığının ve proje hedefleri üzerindeki risk etkilerinin geniş
bir değerlendirmesine dayanıyordu. Anket sonuçları, sosyal bilimler yazılımı için
istatistiksel paket (SPSS sürüm 28) kullanılarak analiz için kullanıldı.
Anahtar Kelimeler: Inşaat Projeleri, Risk, Risk Faktörleri, Risk Yönetimi.

Araştırmaya Başlarken  
  Sıkça Sorulan Sorular